I build apps that people actually enjoy using. Fast, beautiful, and built to convert.
Education
B.Tech in Computer Engineering
ZHCET, AMU
CGPA: 8.3/10Diploma in Computer Engineering
Polytechnic, AMU
Score: 9.97/10Experience
Software Development Intern
Second Plate Inc. (March - June 2026)
Intern
Temflo Pvt Limited (Dec 25 - Feb 26)
Flutter & Full Stack Developer
Freelance
Flutter Workshop Lead
GDGC, ZHCET
Tech Stack
Projects
NextPlate - Food Rescue Platform
A comprehensive food rescue platform connecting restaurants with NGOs to combat food waste. I have engineered this system to be fully production-ready, featuring a scalable architecture and secure workflows for real-world verification and deployment.
Resume Builder
AI-assisted resume/portfolio builder with live preview, ATS scoring, GitHub import, and template PDF export. Deployed on Vercel with responsive dark mode.
DevMRI — Multi-Track DX Scanner
An 8-track comprehensive Developer Experience (DX) scanner that diagnoses repository friction, calculates financial impact, and performs AI-driven 'surgery' to automate Fix PRs. Scans any GitHub repo in 30 seconds to identify bottlenecks in CI, tests, docs, dependencies, environment drift, and code reviews.
SlopGuard — AI Content Quality Detector
1st place hackathon-winning AI content quality detector (F1: 0.926). Measures human oversight rather than AI authorship using 3 novel NLP signals. Full-stack app with FastAPI backend, Next.js dashboard, Chrome extension, and GitHub Action. Processes live content from 10+ sources with explainable scoring across 8 domains.
Erpica - Enterprise Resource Planning UI
A modern, responsive Enterprise Resource Planning (ERP) system interface designed to streamline business operations and enhance organizational efficiency. This comprehensive business management platform integrates multiple core functions into a unified, user-friendly interface with real-time dashboards and automated workflows.
Dockify — AI Docker Config Generator
An AI-powered DevOps engine that generates verified, production-grade Docker configurations for any public GitHub repository. Features a dual-engine architecture: a deterministic static analysis engine detects languages, dependencies, and services, while a local 3B parameter LLM (Llama 3.2 via Ollama) formats config outputs. Validates configurations with a Docker build worker and auto-corrects Dockerfile syntax errors on failure.
OneKey-Deploy — One-command Deployment CLI
Lightweight Node.js CLI (~300 LOC) that auto-detects React/Next.js/static projects and deploys to Vercel, Netlify, or Fly.io in one command.
MindLint — Cognitive Weather for Developers
An AI-powered developer dashboard that tracks your cognitive load, focus patterns, and productivity rhythms. Like a weather app for your brain — visualising mental fatigue, peak performance windows, and burnout risk in real time.
Fractured World - Geopolitical Simulator
An AI-powered geopolitical collapse simulator where players navigate complex world scenarios through strategic decision-making. Experience realistic world simulation with countries evolving, expanding, and collapsing.
BeFocused Chrome Extension
A productivity powerhouse that helps users stay focused with distraction blocking, focus sprints, and activity analytics. Provides smart nudges and productivity insights based on your work patterns.
EVote: Blockchain Voting System
A revolutionary voting platform that leverages blockchain technology to ensure tamper-proof, transparent elections. Features include real-time vote verification, voter anonymity, and immutable records. Built with Flutter for the frontend and Ethereum smart contracts for the backend.
Career Finder App
An AI-powered career guidance application that matches users with ideal career paths based on their skills, interests, and personality. The app features a comprehensive assessment system and provides detailed career roadmaps with resource recommendations.
GDGC AMU Hosted Backend
A robust Node.js backend hosted on Render, supporting a women safety app with Google-based authentication, real-time location APIs, and gamified user engagement. Features include secure login/signup with Google OAuth, SOS request handling, AI-based activity flags, and gamification endpoints for tracking user points, rewards, and safety streaks.
Coding Consistency
GitHub Contributions
Activity trends from @urjitupadhya
Solutions Offered
Flutter Development
I build fast, beautiful cross-platform mobile applications using Flutter, focused on performance and seamless user experiences.
Start projectWeb Development
I create responsive, scalable web applications using React, Next.js, and modern JavaScript with clean architecture.
Start projectBackend Development
I develop robust, scalable APIs and backend systems with Node.js, Express, and MongoDB for efficient data management.
Let's talkBlockchain Solutions
I build secure blockchain-based applications and smart contracts, leveraging Web3 technologies for decentralized solutions.
Get in touch








